Brief
VDAB and Acerta receive visitors every day and work with many workplaces per floor. Both asked for a flexible installation that can grow with the layout.
ELC carried out the general electrical installations, the building infrastructure and the lighting.
Scope
Challenges and approach
Flexible workplaces
The office layout may still change later.
Supplies via floor and ceiling cable routes, with spare capacity per zone.
Reception and counters
Public spaces require different lighting than offices.
Separate lighting circuits and controls for reception, counters and offices.
Timeline
Design
Distribution and lighting plan per floor.
Installation
Distribution, cable routes and lighting.
Handover
Inspection and as-built file.
More projects
All projectsUZ Leuven, Campus Gasthuisberg
Electrical renovation, detection, data and lighting on one of the largest hospital campuses in the country.
Project pageKU Leuven, renovation projects
Data, fire detection, lighting and electrical renovation in three university buildings.
Project pageCiner Glass
Electrical works, external lighting and welding for a new glass factory with 110,000 m² of buildings.
Project pageA similar project in preparation? Then we prefer to look at the drawings together.
Start a project request