Our solutions
We handle the full technical delivery: the charge point itself and the electrical infrastructure it needs.
AREI · inspection by an accredited body · VCA**
AC charge points
Wall-mounted and pedestal charge points for car parks, offices and business premises.
Rapid charging solutions
DC rapid chargers for locations where vehicles leave again quickly.
Charge points for company cars
Charge points for the fleet, on site and at employees’ homes.
Charging infrastructure for business premises
Larger charging sites with multiple charge points and a well-considered distribution.
Electrical connections
Connection to the main distribution board and, where needed, a capacity upgrade with the grid operator.
Cable infrastructure
Trenching, spare conduits and supply cables to each charge point.
Distribution boards
New or adapted boards with the right protection per charge point.
Extension of electrical installations
Adaptation of the existing installation to the extra capacity.
From request to handover
Survey
Car park, available capacity and existing electrical installation mapped.
Tailored proposal
Number and type of charge points, capacity and routes, tailored to the use.
Installation
Cable work, distribution boards and installation of the charge points by a dedicated crew.
Commissioning
Measurements, AREI inspection and handover of the documentation.
What you receive at handover
We close every project with a complete file. This is included as standard.
For whom?
Companies
Charge points for employees, visitors and the vehicle fleet.
Professional locations
Offices, retail, healthcare and public buildings with their own car park.
Industrial environments
Production and logistics sites with a growing number of electric vehicles.
Existing sites
Extension of existing charging infrastructure or electrical installation.
References
All projectsNike Court
Electrical installations, cable routes and lighting for a building of approx. 60,000 m² on the Nike European Logistics Campus.
Project pageAartsen
Electrical installations and approx. 1,800 solar panels for a 21,500 m² distribution centre.
Project pageQuartier Bleu
Electrical installations and lighting for approx. 400 apartments, 50 retail spaces and an underground car park.
Project pageFrequently asked questions
Is your question not listed? Call or email Eren.
Do you also install a single charge point?+
Yes. From a single charge point to a larger charging site: we tailor the solution to the use and the existing installation.
Is my connection heavy enough?+
We measure the available capacity and, if needed, propose an upgrade or extension of the installation.
Do you handle the application with the grid operator?+
Yes. We handle the application and coordination with the grid operator.
Can the charging infrastructure be extended later?+
Yes. We provide cables, spare conduits and boards so extra charge points can easily be added later.
Charging today. Moving tomorrow.
From a single charge point to a larger charging site: we deliver a technically suitable solution.


