Brief
The building combines a large warehouse with refrigerated zones, cold storage, cash & carry and a three-storey office.
The project puts a strong focus on sustainability, with a large solar installation, battery storage, geothermal energy and heat recovery. ELC carried out the general electrical installations and installed approximately 1,800 solar panels.
Scope
Challenges and approach
Cooling and offices in one building
Cold zones, warehouse and offices have very different consumption.
Distribution per zone, so consumption and production can be monitored separately.
Large roof, many panels
Approx. 1,800 panels on a logistics roof.
Installation per roof zone with collective fall protection.
Timeline
Design
Distribution and PV layout worked out.
Installation
Electrical installations per zone.
Solar panels
Installation and connection of the panels.
Handover
Inspection and commissioning.
More projects
All projectsBakker Logistiek
Renovation of the electrical installations: new distribution boards, cable routes and cabling.
Project pageKeus Overduin Seijster Veste
Approx. 2,600 solar panels for a project in the Utrecht / Zeist region.
Project pageDYKA
Approx. 900 solar panels on DYKA’s Belgian production site in Nolimpark.
Project pageA similar project in preparation? Then we prefer to look at the drawings together.
Start a project request