Aartsen distribution centre with solar panels on the roof
Back to projects

LOGISTICS · SINT-KATELIJNE-WAVER

Aartsen

A logistics and distribution centre with warehouse, refrigerated zones, cash & carry and a three-storey office, designed around energy efficiency.

Divisions on this siteElectricalEnergy
Client
Aartsen
Our role
Electrical and solar panels
Location
Sint-Katelijne-Waver
Building
approx. 21,500 m²

Brief

The building combines a large warehouse with refrigerated zones, cold storage, cash & carry and a three-storey office.

The project puts a strong focus on sustainability, with a large solar installation, battery storage, geothermal energy and heat recovery. ELC carried out the general electrical installations and installed approximately 1,800 solar panels.

Scope

ElectricalGeneral electrical installations for warehouse, cold zones and offices.
Solar panelsInstallation of approx. 1,800 solar panels.
Aartsen - site image
IN FIGURES
21,500 m²
building
approx. 1,800
solar panels
3
office floors

Challenges and approach

01

Cooling and offices in one building

CHALLENGE

Cold zones, warehouse and offices have very different consumption.

APPROACH

Distribution per zone, so consumption and production can be monitored separately.

02

Large roof, many panels

CHALLENGE

Approx. 1,800 panels on a logistics roof.

APPROACH

Installation per roof zone with collective fall protection.

Aartsen - detail
Aartsen - works in progress
Aartsen - handover

Timeline

PHASE 01

Design

Distribution and PV layout worked out.

PHASE 02

Installation

Electrical installations per zone.

PHASE 03

Solar panels

Installation and connection of the panels.

PHASE 04

Handover

Inspection and commissioning.