Brief
ELC installed approximately 2,600 solar panels for the project in the Utrecht / Zeist region.
The project demonstrates our experience with large-scale solar installations for commercial and institutional buildings, including across the border.
Scope
Challenges and approach
Working in the Netherlands
Different regulations and a different grid operator.
Installation and registration according to Dutch rules, coordinated with the grid operator.
Safe on the roof
A large roof area with a lot of material.
Collective fall protection and delivery of panels per roof zone.
Timeline
Design
Roof survey and PV layout.
Installation
Mounting per roof zone.
Commissioning
Connection, measurements and handover.
More projects
All projectsDYKA
Approx. 900 solar panels on DYKA’s Belgian production site in Nolimpark.
Project pageTR Engineering
Approx. 800 solar panels for TR Engineering’s industrial site in Europark, Lanaken.
Project pageQuartier Bleu
Electrical installations and lighting for approx. 400 apartments, 50 retail spaces and an underground car park.
Project pageA similar project in preparation? Then we prefer to look at the drawings together.