Brief
TR Engineering is active in industrial engineering and metalworking from Europark in Lanaken.
ELC installed approximately 800 solar panels on the industrial site.
Scope
Challenges and approach
Consumption of a metal company
Metalworking requires a lot of power during working hours.
Installation sized to daytime consumption, so as much as possible is used on site.
Working next to the workshop
Cranes and deliveries around an active workshop.
Delivery and mounting per roof zone, coordinated with production.
Timeline
Design
Consumption analysis and PV layout.
Installation
Mounting of the panels.
Commissioning
Connection and measurements.
More projects
All projectsQuartier Bleu
Electrical installations and lighting for approx. 400 apartments, 50 retail spaces and an underground car park.
Project pageTown hall & police station
Electrical installations, lighting and building infrastructure for the town hall and the police station.
Project pageVDAB & Acerta
Electrical building infrastructure and lighting for the offices of VDAB and Acerta.
Project pageA similar project in preparation? Then we prefer to look at the drawings together.
Start a project request