Brief
Gasthuisberg is a hospital, a research centre and a university campus at once. The renovation takes place while the campus remains fully in use.
ELC carries out electrical renovations and installs detection systems, data infrastructure, lighting, cabling and distribution boards.
Scope
Challenges and approach
Hospital in operation
Care, research and teaching continue during the works.
Changeovers planned with the technical department, outside the peak hours of the wards.
Critical circuits
Some equipment must not lose power.
Temporary supplies and checks of the emergency power circuits before every interruption.
Dust and hygiene
Working right next to care wards.
Closed-off work zones and dust screens, coordinated with hospital hygiene.
Timeline
Survey
Existing installations surveyed per zone.
Planning with the wards
Interruptions agreed in advance.
Renovation per zone
Boards, cabling, data, detection and lighting.
Handover
Measurements and documentation per zone.
More projects
All projectsKU Leuven, renovation projects
Data, fire detection, lighting and electrical renovation in three university buildings.
Project pageCiner Glass
Electrical works, external lighting and welding for a new glass factory with 110,000 m² of buildings.
Project pageJanssen Pharmaceutica
Electrical infrastructure and industrial works on the campus in Beerse, including the LION lab building.
Project pageA similar project in preparation? Then we prefer to look at the drawings together.
Start a project request


